Levels of a Project Schedule

 Dear Readers,

The project's success relies on various activities, with effective scheduling being crucial. A project schedule refers to a tool used to communicate the timeline of a project, including its tasks, dependencies, assigned resources, and milestones. It serves as a roadmap for the project.

Key components of a project schedule are Project Milestones, Timeline, Tasks, Dependencies, and resources. Schedules are typically developed from the top down, like a pyramid. Starts from Level-1 (L1), Level-2 (L2), and will go up to Level-5 (L5).

L-1 Schedule = (Level 1) Management/Milestone Level Schedule 

L-2 Schedule = (Level 2) Master Schedule 

L-3 Schedule = (Level 3) Project Level Schedule 

L-4 Schedule = (Level 4) Control Level Schedule 

L-5 Schedule = (Level 5) Detail Level Schedule or Look-ahead Schedule

L1 may be a short table of milestones corresponding to "Top Management Summary." 

L2 is a Master Schedule. It provides an integral plan of the Project activities for Project management. It is a "Project Management Summary." 

L3 is a Project Level Schedule. It is a summary of activities from the level 4 schedule 

L4 is a Control Level Schedule. It covers the whole project and doesn't go into the task-level detail, but should provide enough of a breakdown for clients to see what is happening at every step.

L5 is a Detail Level Schedule. It shows the lowest level of detail necessary to complete the Task. These schedules are temporary documents based on the 'Look-ahead' schedule and used to coordinate work in an area. 

The schedules above help communicate the project plan and timeline to all stakeholders. They guide the project team through the sequence of activities and deadlines during execution, while also serving as a baseline to track progress, spot delays, and make adjustments as needed.

Common formats used to prepare and monitor the project schedules are Gantt chart, WBS & CPM

Gantt chart: A popular visual representation that uses a horizontal bar chart to show the timeline of tasks and their dependencies. 

Work Breakdown Structure (WBS): It is a hierarchical chart that breaks down a project into smaller, more manageable tasks, helping to map dependencies. 

Critical Path Method (CPM): A technique to identify the longest sequence of tasks that determines the minimum project duration. Any delay to a task on the critical path delays the entire project. 

Thank you for reading this article. I hope you found it beneficial and helpful as a beginner in the construction industry. If you found this article useful, please don't forget to share it with your friends and colleagues.

Related Posts Plugin for WordPress, Blogger...

Labels

Abbreviations (39) ABW (1) AC (2) Acre (2) acronyms (13) Admixture (3) Alloy Steel (1) Analysis (3) ANSI (1) Anti friction bearing (2) Apothecaries Mass (1) Arc welding (2) Avoirdupois Mass (1) AWG (4) AWS (4) BCR 295 (2) Beam (22) Bearings (5) Benefits (2) Blasting & Painting (8) Blogoversary (5) Bolt (8) CAR A/C (1) Cartoon (2) Cement (1) Cent (2) CHANNEL (8) Chequered Plate (1) Chinese (4) Civil (7) Classification (3) Cleaning (4) Cold Rolled Steel (2) Colour Code (1) Column Section (1) Composite Materials (3) Computer (1) Concrete (4) Construction Industry (23) Conversion Table (4) Cooking (1) Costing (4) Crane Rail (2) Cylinders (1) Density (1) DFT (2) Domestic (5) Drill bit (1) Drill gauge (1) Drilling (1) Dry Ice (1) EHS (1) Electrical (1) Electrode (1) Ellipcon Steel (1) Elliptical Hollow Section (1) EN 10083-3 (1) EN 10219 (1) Engineer Day (7) Engineering Miracle (2) Environment (1) Equipment (2) ESI (1) Estimation (2) European Steel (3) Factory Act (1) fasteners (3) Fibre Rope (4) Fire (1) FLAT (3) floating crane (1) Flood (1) Foil (1) Formula (1) FRP (3) GAUGE (9) General (35) Greetings (9) GST (1) H-beam (4) Handrail (1) Heavy Weight Beam (1) HeliArc (1) Helmet (2) HEXAGOAN (2) Hollow Rectangle (3) Hollow Square (5) Hollow Steel (10) Hot rolled Steel (30) HR & IR (2) HSFG (2) HSS (9) HT (1) HT BOLT (1) I-Beam (4) Information (10) Informations (5) Introduce (4) IP (1) IPE (3) IS 1173 (5) IS 1363 (2) IS 1786 (1) IS 3443 (2) IS 4923 (2) IS 808 (15) IS:1732 (1) ISA (2) ISCR (1) ISHB (3) ISJB (4) ISJC (2) ISLB (3) ISLC (2) ISMB (4) ISMC (2) ISMCP (1) ISNT (2) ISSC (2) ISWB (3) JIS G3466 (1) Joints (2) Junior Beam (2) Junior Channel (3) Labour Law (7) Labour Welfare (4) Lamination (2) Land Measurement (2) Light Beam (2) Light Channel (3) LPG Cylinder (1) Man Day (2) Man Hour (1) Man Month (1) Management (1) Mass (3) Measurement (3) mechanical (1) Metals (7) Mile Stone (2) Music Wire (4) MWG (6) Non-Metal (3) Numbers (3) OCTOGAN (1) Oil (1) Painting (6) PAN (1) Parallel Flange Channel (2) PFC (2) PIPE (5) Piping (4) Planning (9) Plastics (2) Plates (1) Pole (1) PPE (1) Precautions (4) Projects (1) Protection (1) Rain (1) Rebar (1) Reconciliation (2) Reinforcement Rod (1) Reinforcemnt Steel (1) Reo (1) Rigging (9) River on River (1) Rope (7) ROUND (2) RSJ (1) Safety (14) Scale (1) Schedules (1) Self Explanatory (5) SEP (5) Serrated Flat (1) Sheet (3) Short cut key (1) Sling (1) Slit Tee (1) Specific Gravity (4) Spoon (1) SQUARE (2) SSPC (1) Steel (21) Steel Beam (7) Steel Section (6) Steel Section Type (5) Stick welding (1) Structural Steel (58) Surface Preparation (8) SWG (5) SWL (1) Technical (10) Tee Section (5) Thanks (7) TIG (1) TIG Welding (1) Tips (2) Tools & Tackles (2) Torque (6) Troy Mass (1) TUBE (2) Turnbuckle (1) UB (2) UC (2) Unit of Mass (1) UNIT WEIGHT (58) Universal Beam (1) universal Column (2) Useful Tips (3) Valve (1) Water (4) Weather (3) Weight (14) Welding (17) Wide Flange Beam (2) Wind (7) Wind Speed (4) Wire Rope (3) Wishes (20) WWD (1)

Contact Form

Name

Email *

Message *

Note

1) I have extracted the information from reference sources which may not be in accordance with the latest Standards - as identified.

2) The data’s are based on a review of various reference sources. For important work please check against quality information sources.

3) The Articles are no way connected to company of author belongs.

4) This Blog will not be liable for any, direct or indirect, consequential or incidental damages or loss arising out of the use of this information.

5) If you have any suggestions or feedback on how this blog can improve it for you, please feel free to e-mail me (engineerdiary@gmail.com) Self will try my best to keep up with it!

6) Paypal account of this site is engineerdiary@gmail.com

7) If your brand/company is keen to work with Engineer Diary for advertisement and sponsorship, you can drop us an email at engineerdiary@gmail.com

8) For More Disclaimer please refer Disclaimer Page