Time & Change Management

Dear Readers,

When you have promoted from your current position, your income, facilities and responsibilities will raise. Simultaneously, your working team size will also grow. You will connect with more people than ever before.

As all these grow, the essential ingredient, time does not grow. It is used to be 24 hours and it's the same now.

So, it creates a lot of pressure. A compulsion develops to produce maximum results in a short period of time and the nature of work is also changing.

As we move up the ladder of an organization, our work habits change and our work ethic also changes. However, there is still involvement in that old activities, what we had so far. It is little difficult to break free from that old assignments/works immediately. Even if someone has been hired/assigned to deal with the old work. We like to interrupt again because of these habits.

Thus wastes his time and ours as well. Except ourselves, there is no one else to do the work for the new responsibility. Hence, note that another job or responsibility can be taken up only after leaving the old job or responsibility.

Let us See the scenario in any industry.

Initially a worker duty is to produce goods. As he performed well, respecting his skill and hard work, the company promotes him and appoints him as a supervisor.

With the new position comes along with new responsibilities, like training others and supervising them, he needs to spend more time on these. Apart from this, he may require some time for planning activities of production (Works), strengthening the relationships with other departments, etc.

When the next promotion makes him as a manager, the responsibilities of this position require a different kind of performance from him. Now he spends more time on planning, overseeing coordinated operations, preparing his subordinates to handle more responsibilities. The previous supervisory function and direct involvement in production should be reduced (avoided).

The work is still different when the next management level is reached like strengthening external contacts and their relations. Duties such as analyse the market, Prepare and formulate appropriate growth strategies and preparing for the company's next phase of growth will become the main task.

If you want to spend more time on exclusive activities in the respective levels, it can only be done if other duties are avoided.

There is no change in the fact that there are 24 hours in a day. However, many people do not feel like leaving other duties aside.

He wants everyone to think that he is important, that’s why he doesn't want to tell anyone that he can't.

All this combined with the desire to make everyone happy reduces the amount of time available for specific tasks.

This means that time management is really self-management. By managing our activities, we can manage time.

Whether we like it or not, this moment won't stop. We have a choice to change with something, with what to change, but not to change. That is why we should be careful.

Some people exchange their time with the comfort of sleeping. Still others substitute it for entertainment, recreation and amusement. Some others alternate with noble actions and actions that result in great accomplishments.

Hence, time Management and changes are more important in professional life.

Sunday, July 7, 2024

Welding Terms Part-4 (G&H)

Dear Readers,

This is continuation of Part-3. Welders can be found working in manufacturing plants, building job sites, and rebuilding infrastructure such as bridges and highways. Being able to move from industry to industry offers a higher level of job security than many other types of jobs. it’s useful to know some terms of Welding.

Galvanized – An electrochemical process where mild steel is hot-dipped into liquid zinc to make it anti-corrosive.

Gas Carbon-Arc Welding – An arc welding process in which fusion is produced by heating with an electric arc between a carbon electrode and the work. Shielding is obtained from an inert gas such as helium or argon. Pressure and/or filler metal may or may not be used.

Gas Metal Arc Welding (GMAW) – An arc welding process where the arc is between a continuous filler metal electrode and the weld pool. Shielding from an externally supplied gas source is required.

Gas Pocket – A weld cavity caused by the trapping of gases released by the metal when cooling.

Gas Tungsten Arc Welding (GTAW) – An arc welding process where the arc is between a tungsten electrode (non-consumable) and the weld pool. The process is used with an externally supplied shielding gas.

Gas tungsten arc welding-pulsed arc (GTAW-P) – A variation of the gas tungsten arc welding process in which the current is pulsed.

Gas Welding – Welding with the heat from an oxy-fuel flame, with or without the addition of filler metal or pressure.

Globular Transfer – A type of metal transfer in which molten filler metal is transferred across the arc in large droplets.

Goggles – Safety equipment worn to protect the welder’s eyes from harmful radiation while welding and cutting.

Gouging – The forming of a bevel or groove by material removal.

Groove – An opening or channel in the surface of a part or between two components which provides space to contain a weld.

Groove angle – The total included angle of the groove between parts to be joined by a groove weld.

Groove face – That surface of a member included in the groove.

Groove radius – The radius used to form the shape of a J- or U-groove weld joint.

Groove type – The geometric configuration of a groove.

Groove Weld – When a very strong weld is needed, such as where two columns are spliced together on a high-rise, it is important to get the maximum penetration and fusion. This is done by cutting a Bevel so that you can weld solid from the Root to the face of the parent metal. Examples: single V, single U, single J, double bevel etc.

Ground Connection – A safety connection from a welding machine frame to the earth. Nothing but earthing.

Ground Lead – When referring to the connection from the welding machine to the work, see preferred term Workpiece Lead.

GTAW – Gas Tungsten Arc Welding. also known as tungsten inert gas (TIG) welding.

Guided Bend Test – A bending test in which the test specimen is bent to a definite shape by means of a jig.

Hammer Welding – A forge welding process.

Hand shield – Also called face Shield. A protective device, used in arc welding, for shielding the eyes, face and neck. A hand shield is equipped with a suitable filter plate and is designed to be held by the hand.

Hard Facing – A particular form of surfacing in which a coating or cladding is applied to a surface for the main purpose of reducing wear or loss of material by abrasion, impact, erosion, galling, and cavitation.

Hard Surfacing – The application of a hard, wear-resistant alloy to the surface of a softer metal.

Hardening – This term refers to a process used to increase the hardness of metal, typically iron-based alloys, by heating it above a certain critical temperature range and then rapidly cooling or “quenching” it.

Heat-Affected Zone (HAZ) – That section of the base metal, generally adjacent to the weld zone, whose mechanical properties or microstructure, have been altered by the heat of welding.

Heat Time – The duration of each current impulse in pulse welding.

Heat Treatment – An operation or combination of operations involving the heating and cooling of a metal or an alloy in the solid state for the purpose of obtaining certain desirable conditions or properties.

Helmet – protection equipment worn to protect the welder’s face and neck.

Hermetically Sealed – Airtight. Heterogenous – A mixture of phases such as: liquid-vapor or solid-liquid-vapor.

Hertz – Hertz is often referred to as "cycles per second." In the United States, the frequency or directional change of alternating current is usually 60 hertz.

Hold time – The time that pressure is maintained at the electrodes after the welding current has stopped.

Horizontal Weld – A bead or butt-welding process with its linear direction horizontal or inclined at an angle less than 45 degrees to the horizontal, and the parts welded being vertically or approximately vertically disposed.

Horn – The electrode holding arm of a resistance spot welding machine.

Horn Spacing – In a resistance welding machine, the unobstructed work clearance between horns or platens at right angles to the throat depth. This distance is measured with the horns parallel and horizontal at the end of the downstroke.

Hot Crack – A crack formed at temperatures near the completion of weld solidification.

Hot Pass – In pipe welding, the second pass which goes over the root pass.

Hot Short – A condition that occurs when a metal is heated to that point, prior to melting, where all strength is lost but the shape is still maintained.

Hydrogen Brazing – A method of furnace brazing in a hydrogen atmosphere.

Sunday, June 9, 2024

Abbreviations Used in Construction Industry - Part 2 (D to F)

Dear Readers,

This is continuation of Part-1. One of the major components of successful construction projects is communication. The performance of a project is usually based on metrics such as scope, schedule, cost, quality, and safety. Depending on your construction operations, a working glossary of construction acronyms and terms may be useful for employees, as well as clients, subcontractors, and other business partners. 

76) DA – Diluted Acetylene. (Used for Gas Cutting purpose). 

77) DB – Distribution Board.

78) dB – Decibel. The decibel (dB) is a logarithmic unit used to measure sound level.

79) DBB – Design-Bid-Build – This is a common project delivery method where design services and construction are procured separately. The contractor bids on a project based on plans (usually complete) developed by an architect or engineer.

80) DBIA - (Design-Build Institute of America) – A professional organization for the design-build Construction Industry.

81) DBM – Dense Bituminous Macadam (DBM) is a binder course used for roads and highway works.

82) DFR – Daily Field Report.

83) DIA – Diameter. This refers to the measured distance across the face of a cylindrical or circular element, such as a drilled shaft or pipe.

84) Dispute Resolution – The Process of Resolving Disputes.


85) DIM – Dimension.

86) DIY – Do it Yourself.

87) DL – Dead Load.

88) DLR – Daily Labour Report.

89) Doc. – Document.

90) DOR – Divisional of Responsibilities.

91) DPR – Daily Progress Report.

92) DPT – Dye Penetration Test.

93) DTS – Daily Task Sheet.

94) DW – Dry Weight. 

95) DWG – Drawing. In computer-aided design and drafting and architectural contexts, this is an abbreviation for drawing, as in a construction sheet or blueprint.

96) EA – Each. “EA” is used to quantify items that are counted as whole units.

97) EAC – Estimate at Completion – In earned value analysis, this is the expected cost when the project is complete.

98) Earth Works – All type of under the earth works. Like- Excavation, Back Fill, Sand Fill, Disposal of surplus earth.

99) E&C – Engineering & Construction.

100) ECC – Erection Completion Certificate. It is a form of clearance to proceed the commissioning activities. (It is a certificate or undertaking given by all departments like Civil, Mechanical, Electrical, C&I that all works are completed as per drawing)

101) ECO – Economiser Coil. It is a part of boiler pressure part.

102) E&I / I&E – Electrical and Instrumentation.

103) EIC – Engineer In-Charge, who is holding authorise to Execute the Job. 

104) EIFS  (Exterior Insulation and Finish System) – A wall cladding used for insulation and aesthetics.

105) EIR  (Environmental Impact Report) – A Document That Assesses the Potential Environmental Impacts of a Construction Project.

106) EJ – Expansion Joint.

107) EL – Existing Level.

108) EL(+XX) – Elevation of structure (+) Above Ground & (-) Underground, XX- denotes number in meters. (Example EL+15 denotes 15-meter elevation from above ground)

109) ELCB – Earth Leakage Circuit Breaker, it is a safety device used in electrical installations with high Earth impedance to prevent shock.

110) Electrical Services – The Provision of Electrical Services for a Construction Project.

111) Environmental Management – The Management and Control of Environmental Impacts in a Construction Project.

112) E&O – Errors & Omissions- This refers to mistakes, oversights or missing details in a set of construction drawings.

113) EOR  (Engineer of Record) – The licensed professional engineer responsible for the design of a construction project.

114) EOT – Extension of Time.

115) EP – Earthing Pit.

116) EPC – Engineering, Procurement & Construction.

117) EQPT. – Equipment.

118) Equipment Management – The Process of Managing and Coordinating the Use of Equipment on a Construction Site.

119) ERP – Enterprise Resource Planning.

120) ETC – Estimate to Complete – This is the remaining cost expected to complete a project.

121) EST. – Estimate.

122) EV – Earned Value – EV is the percent of the total budget that is completed at a given point in the project duration.

123) Excavation – The Removal of Soil or Rock to Create a Foundation or Basement.

124) EXW – Extra Works denotes work executed away from the scope of works.

125) FA – Fire Alarm.

126) Façade – The Exterior Surface of a Building.

127) Facility Management – The Management and Maintenance of a Building or Infrastructure After Completion.

128) FAT – Factory Acceptance Test.

129) FB – Floor Beam.

130) FCAW – Flux Cored Arc Welding (FCAW), also known as dual shield welding, is a semi-automatic arc welding process that is similar to metal active gas (MAG) welding.

131) FDAS – Fire Detection and Alarm Systems.

132) FES – Field Engineering Service. It is used to do site / field engineering at construction site.

133) F&F – Full and Final.

134) FF – Fire Fighting.

135) FFC – Financial Forecast. It is used to forecast the fund requirement for site execution. 

136) FFL – Finished Floor Level.

137) FGL – Finished Ground Level.

138) FH – Fire Hydrant.

139) Field Measurement – The Process of Measuring and Documenting the Dimensions and Location of Elements in a Construction Project.

140) FIM – Free Issue Material.

141) FL – Floor Level.

142) Float – The Amount of Time Available in a Construction Project Schedule to Complete a Task Without Delaying the Overall Project Completion Date.

143) FOB – Foot Over Bridge.

144) FOC – Face of Concrete.

145) FOF – Face of Finish.

146) Foundation (Fdn) – The Underlying Structure of a Building that supports its weight.

147) Formwork / Framing – The Structure of a Building That Provides Support for Walls and Roof.

148) FoS – Factor of Safety.

149) FQP – Field Quality Plan. It is the construction test checks during execution to ensure the required quality of job.

150) FY – Fiscal Year / Financial Year.

Related Posts Plugin for WordPress, Blogger...

Labels

Abbreviations (38) ABW (1) AC (2) Acre (2) acronyms (12) Admixture (3) Alloy Steel (1) Analysis (3) ANSI (1) Anti friction bearing (2) Apothecaries Mass (1) Arc welding (2) Avoirdupois Mass (1) AWG (4) AWS (4) BCR 295 (2) Beam (22) Bearings (5) Benefits (2) Blasting & Painting (8) Blogoversary (5) Bolt (8) CAR A/C (1) Cartoon (2) Cement (1) Cent (2) CHANNEL (8) Chequered Plate (1) Chinese (4) Civil (7) Classification (3) Cleaning (4) Cold Rolled Steel (2) Colour Code (1) Column Section (1) Composite Materials (3) Computer (1) Concrete (4) Construction Industry (23) Conversion Table (4) Cooking (1) Costing (3) Crane Rail (2) Cylinders (1) Density (1) DFT (2) Domestic (5) Drill bit (1) Drill gauge (1) Drilling (1) Dry Ice (1) EHS (1) Electrical (1) Electrode (1) Ellipcon Steel (1) Elliptical Hollow Section (1) EN 10083-3 (1) EN 10219 (1) Engineer Day (7) Engineering Miracle (2) Environment (1) Equipment (2) ESI (1) Estimation (2) European Steel (3) Factory Act (1) fasteners (3) Fibre Rope (4) Fire (1) FLAT (3) floating crane (1) Flood (1) Foil (1) Formula (1) FRP (3) GAUGE (9) General (35) Greetings (9) GST (1) H-beam (4) Handrail (1) Heavy Weight Beam (1) HeliArc (1) Helmet (2) HEXAGOAN (2) Hollow Rectangle (3) Hollow Square (5) Hollow Steel (10) Hot rolled Steel (30) HR & IR (2) HSFG (2) HSS (9) HT (1) HT BOLT (1) I-Beam (4) Information (10) Informations (5) Introduce (4) IP (1) IPE (3) IS 1173 (5) IS 1363 (2) IS 1786 (1) IS 3443 (2) IS 4923 (2) IS 808 (15) IS:1732 (1) ISA (2) ISCR (1) ISHB (3) ISJB (4) ISJC (2) ISLB (3) ISLC (2) ISMB (4) ISMC (2) ISMCP (1) ISNT (2) ISSC (2) ISWB (3) JIS G3466 (1) Joints (2) Junior Beam (2) Junior Channel (3) Labour Law (7) Labour Welfare (4) Lamination (2) Land Measurement (2) Light Beam (2) Light Channel (3) LPG Cylinder (1) Man Day (2) Man Hour (1) Man Month (1) Management (1) Mass (3) Measurement (3) mechanical (1) Metals (7) Mile Stone (2) Music Wire (4) MWG (6) Non-Metal (3) Numbers (3) OCTOGAN (1) Oil (1) Painting (6) PAN (1) Parallel Flange Channel (2) PFC (2) PIPE (5) Piping (4) Planning (8) Plastics (2) Plates (1) Pole (1) PPE (1) Precautions (4) Protection (1) Rain (1) Rebar (1) Reconciliation (2) Reinforcement Rod (1) Reinforcemnt Steel (1) Reo (1) Rigging (9) River on River (1) Rope (7) ROUND (2) RSJ (1) Safety (14) Scale (1) Self Explanatory (5) SEP (5) Serrated Flat (1) Sheet (3) Short cut key (1) Sling (1) Slit Tee (1) Specific Gravity (4) Spoon (1) SQUARE (2) SSPC (1) Steel (21) Steel Beam (7) Steel Section (6) Steel Section Type (5) Stick welding (1) Structural Steel (58) Surface Preparation (8) SWG (5) SWL (1) Technical (10) Tee Section (5) Thanks (7) TIG (1) TIG Welding (1) Tips (2) Tools & Tackles (2) Torque (6) Troy Mass (1) TUBE (2) Turnbuckle (1) UB (2) UC (2) Unit of Mass (1) UNIT WEIGHT (58) Universal Beam (1) universal Column (2) Useful Tips (3) Valve (1) Water (4) Weather (3) Weight (14) Welding (16) Wide Flange Beam (2) Wind (7) Wind Speed (4) Wire Rope (3) Wishes (20) WWD (1)

Contact Form

Name

Email *

Message *

Note

1) I have extracted the information from reference sources which may not be in accordance with the latest Standards - as identified.

2) The data’s are based on a review of various reference sources. For important work please check against quality information sources.

3) The Articles are no way connected to company of author belongs.

4) This Blog will not be liable for any, direct or indirect, consequential or incidental damages or loss arising out of the use of this information.

5) If you have any suggestions or feedback on how this blog can improve it for you, please feel free to e-mail me (engineerdiary@gmail.com) Self will try my best to keep up with it!

6) Paypal account of this site is engineerdiary@gmail.com

7) If your brand/company is keen to work with Engineer Diary for advertisement and sponsorship, you can drop us an email at engineerdiary@gmail.com

8) For More Disclaimer please refer Disclaimer Page